B173 Hochstadt, bridge over the Main and railway lineB173 Hochstadt, bridge over the Main and railway line
Structural engineering
Road and traffic route construction
Civil engineering
Eiffage Infra-Süd
Client
Staatliches Bauamt Bamberg
Project volume
54 million EUR
Construction time
44 months
New construction of bridge BW 11-2 over the Main and the Bamberg-Hof railway line: The structure consists of seven spans and is being built using the steel composite construction method with incremental launching.