B173 Hochstadt, bridge over the Main and railway lineB173 Hochstadt, bridge over the Main and railway line

  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Süd

Client

Staatliches Bauamt Bamberg

Project volume

54 million EUR

Construction time

44 months

New construction of bridge BW 11-2 over the Main and the Bamberg-Hof railway line:
The structure consists of seven spans and is being built using the steel composite construction method with incremental launching.