Construction of the new Fuhrbach Bridge in Brand in the Fichtelgebirge

  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Süd
  • Project update

Kund

Staatliches Bauamt Amberg-Sulzbach

Projektvolym

1.500.000 €

Byggtid

04.2025  –  11.2025

The southern gateway to the Fichtelgebirge: Construction of the new Fuhrbach Bridge on the St 2181, north-west of Brand

  • Functional tender (design and construction)
  • Construction of a new bridge as a single-span integral structure without joints or bearings, built using reinforced concrete
  • including a forest track and a corrugated steel culvert with a clear width of 2 m