Construction of a replacement temporary structure over the A 73 near Wendelstein

  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Süd
  • Project update

Kund

Die Autobahn GmbH des Bundes, Niederlassung Nordbayern

Projektvolym

2.400.000 €

Byggtid

04.2025  –  11.2025

  • Replacement construction of BW4b as a flyover of the St2225 over the A73 motorway
  • Construction of the temporary ramps and erection of the temporary bridge
  • approx. 3,000 m³ of topsoil and approx. 28,000 m³ of earthworks
  • approx. 26,000 m³ of new earth for backfilling and temporary embankments
  • approx. 7,900 m² of asphalt for temporary ramps