Nuremberg bypass MDK

  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Süd
  • Project update

Kund

Stadt Nürnberg

Projektvolym

10.000.000 €

Byggtid

03.2025  –  03.2026

Nuremberg, construction of the temporary bypass for the replacement of the bridges over the Main-Danube Canal and the south-west bypass

  • 700 m temporary bypass
  • 40,000 m³ earth masses of soldier pile wall shoring
  • 105 m solid retaining wall
  • 10,000 m² asphalt surfaces
  • 1,000 m concrete drainage pipes

 

Rescheduling / optimisation of the temporary bypass by planning a soldier pile wall shoring "cofferdam"