A3 Regensburg: Replacement bridge on the BW 55

  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Süd
  • Project update

Kund

Die Autobahn GmbH (ehemals Autobahndirektion Südbayern)

Projektvolym

3.400.000 €

Byggtid

03.2021  –  11.2023

Expansion of the A3 motorway to six lanes between Nuremberg and Passau, from the Regensburg junction to the Rosenhof slip road

Demolition and replacement of the BW 55 in two construction phases

  • Demolition of the BW 55 and construction of a replacement single-span structure using reinforced concrete
  • Underpass on Universitätsstraße
  • Full upgrading and resurfacing of Universitätsstraße, including the construction of footpaths and cycle paths