Au in der Hallertau: Redesign of the Untere and Obere Hauptstraße in two construction phases
Roadworks and civil engineering works
- Development area for the Lower and Upper Hauptstraße in Phase 1: 5,400 m²
- Area to be upgraded on Untere and Obere Hauptstraße in Construction Phase 2: 3,400 m²
- Roadways and traffic areas including pavements, access roads to buildings and properties, as well as adjacent and juncting local roads
Construction phase 2 in detail:
- 3,300 m² of road surface removal, including kerbs and base courses
- 2,400 m³ earthworks
- 2,600 m² of natural stone paving
- Drainage, including connections to houses and properties
- Preparation of fibre-optic cables
- and much more