Redesign of the main road through Au in der Hallertau

  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Süd
  • Project update

Client

Markt Au in der Hallertau

Project volume

4.900.000 €

Construction time

05.2021  –  10.2023

Au in der Hallertau: Redesign of the Untere and Obere Hauptstraße in two construction phases

Roadworks and civil engineering works

  • Development area for the Lower and Upper Hauptstraße in Phase 1: 5,400 m²
  • Area to be upgraded on Untere and Obere Hauptstraße in Construction Phase 2: 3,400 m²
  • Roadways and traffic areas including pavements, access roads to buildings and properties, as well as adjacent and juncting local roads

Construction phase 2 in detail:

  • 3,300 m² of road surface removal, including kerbs and base courses
  • 2,400 m³ earthworks
  • 2,600 m² of natural stone paving
  • Drainage, including connections to houses and properties
  • Preparation of fibre-optic cables
  • and much more