Traffic control system A 3

  • Structural engineering
  • Eiffage Infra-West

Kund

Landesbetrieb Straßenbau NRW NL Krefeld und Leverkusen

Projektvolym

approx. 23 million EUR (in consortium)

Byggtid

September 2015 -

Manufacture and installation of a traffic control system (VBA)

The VBA extends over a length of approx. 7.5 km on the A 3 motorway between the Hilden interchange and the Mettmann interchange, in the area between the Hilden interchange and the Breitscheid interchange, approx. 18 km (2nd construction phase) as well as the 3rd construction phase on the A 3 and partly on the A 2 motorway between the Breitscheid interchange and the Oberhausen interchange in both directions of travel.

Production and installation of

  • accessible traffic sign gantries
  • Accessible traffic sign cantilevers
  • Walk-on variable message sign gantries (WVZB)
  • 4 variable message signs for dynamic signposting with integrated traffic jam information (dWiSta)
  • cable ducts, induction loops, prismatic turnstiles and all electrical installations