Superstructure reinforcement TB Westerschledde

  • Structural engineering
  • Eiffage Infra-West

Kund

LB Straßen NRW, Hamm

Byggtid

08/2019 - 04/2020

External prestressing and additional reinforcement was installed on the underside of the superstructure of the prestressed concrete bridge.

Superstructure reinforcement of the Westerschledde viaduct, A44 motorway near Geseke

  • Steel construction / shear reinforcement
  • 92 steel crossbeam shear prestressing
  • 40 pcs deflection construction
  • HDW
  • 360 m² Preparation of concrete base
  • 184 pcs. recesses made by HDW
  • Concrete repair
  • 200 pcs chiselling out concrete damage, relining
  • 184 pcs HDW reworking and sealing of recesses
  • Reinforced concrete/shotcrete
  • 11,800 pcs. production of bonded anchors
  • Install 24 tonnes of reinforcing steel
  • Produce 33 m³ of reinforced concrete
  • Produce 43 m³ of shotcrete
  • Tendon prestressing
  • 96 bar tendons, transverse prestressing, supply and install anchor blocks
  • 184 bar tendons Shear reinforcement supply, installation
  • 1,497 m tendons supply, installation