MARK 51°7 in Bochum, lot 1.8

  • Civil engineering
  • Eiffage Infra-West

Kund

Bochum Perspektive 2022 GmbH

Projektvolym

2.38 million EUR

Byggtid

February 2017 - November 2017

Reactivation and development of the site of the former Opel plant 1 in Bochum (MARK 51°7)

Construction of an angular retaining wall with installation of a rear drainage and dewatering pipe including associated shaft structures as well as various site improvements during construction.

  • Angled retaining wall as semi-prefabricated part with in-situ concrete spur
    • To support the approx. 7.5 m high terrain offset between the future DHL logistics centre and the so-called Planstrasse A
    • Load transfers from an up to 10 m high noise protection wall placed on the angled retaining wall (and alternatively a corresponding noise protection wall) must be taken into account
    • Total length of retaining wall approx. 580 m
  • Pipe laying work (steel pipes and plastic pipes)