Construction of an angular retaining wall with installation of a rear drainage and dewatering pipe including associated shaft structures as well as various site improvements during construction.
- Angled retaining wall as semi-prefabricated part with in-situ concrete spur
- To support the approx. 7.5 m high terrain offset between the future DHL logistics centre and the so-called Planstrasse A
- Load transfers from an up to 10 m high noise protection wall placed on the angled retaining wall (and alternatively a corresponding noise protection wall) must be taken into account
- Total length of retaining wall approx. 580 m
- Pipe laying work (steel pipes and plastic pipes)