Rapphofs Mühlenbach watercourse development and new bridge construction

  • Structural engineering
  • Civil engineering
  • Eiffage Infra-West

Kund

Lippeverband Essen

Byggtid

19 months

Deepening the bed of the Rapphofs Mühlenbach stream and construction of a new replacement bridge on Altendorfer Straßen in Dorsten

Rapphofs Mühlenbach watercourse regulation. By deepening the river bed and widening the profile between km 4.4 and 4.9, the upstream flow disturbances caused by mining activities were eliminated.

  • Bridge demolition on Altendorfer Straße and at a farm access road
  • New construction of a farm access road
  • Use of a temporary bridge
  • Replacement construction of the Altendorfer Straße bridge over the Rapphofs Mühlenbach stream
  • Road construction work on Altendorfer Straße