Nuremberg Tram, Track renewal on Gibitzenhofstraße:
- Renewal of 240 metres of double track on the tram section between Gibitzenhofstraße 150 and 166
- Dismantling of the existing tracks
- Construction of new tracks with reinforced concrete beams
- Work to be carried out in three construction phases