Nuremberg Tramway, Allersberger Straße Track Renewal, Lot 1: Slab Track
- Renewal of the track system, including dismantling and laying of new track over a length of approximately 500 metres
- Lot 1: a total of approx. 700 metres of track as ballasted track
- Refurbishment in-situ
- Route optimisation with minimal track realignment
- Photos © VAG Nuremberg