Bridge Buselohstraße Bochum

  • Structural engineering
  • Eiffage Infra-West

Kund

Stadt Bochum

Projektvolym

6.4 million EUR

Byggtid

September 2015 - November 2017

New construction of an arched truss bridge

New construction of an arched truss bridge (1 span) with concrete carriageway slab and new construction or development of the adjacent traffic routes (roads, roundabout, etc.).

The bridge spans 6 tracks of DB AG's long-distance and passenger railway in the Bochum - Dortmund section.
Shifting took place at the end of November 2016 in one piece in an elevated position via auxiliary yoke.

Bridge structure:

  • Span centre distance: 85 m
  • Arched spans and bridge height: 11.0 m / 12.3 m
  • Roadway and bridge width 10.7 m / 17.5 m

Road construction:

  • Roundabout and cycle paths on the new sections of Buselohstraße,
  • Total asphalt construction 5,100 m²
  • 2 new bus stops
  • Noise protection in the form of a gabion wall
  • Earthworks incl. shoring for pipe laying