New bridge construction and roadworks for the relocation of the B173 Lichtenfels BW 8-1 / 7-1

  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Süd

Kund

Staatliches Bauamt Bamberg

Projektvolym

9.000.000 €

Byggtid

19 months

Construction of flyover structure 8-1 over the future two-lane B173
Construction of BW 7-1 for underpassing a future flood trough 
Road construction for the relocation of the B173 over a length of 1,022 m

  • Construction of the 8-1 overpass across the future double-track B173
  • Construction of structure 7-1 to form an underpass beneath a future flood basin
  • Roadworks for the realignment of the B173 over a distance of 1,022 m