Main services: Inner-city cable laying, utility tunnelling and road construction
- 1,100 m of 110 kV protective conduit route within a concrete block to a depth of 3 m, including shoring
- 7 construction sites, 6 road junctions
- 2 joint structures
- 350 m of drinking water pipe replacement and re-routing
- 4,000 m² of road excavation and asphalt road construction
- 600 m² of large-format paving, small-format paving and soapstone paving
- 400 m of guttering made from large and random-sized paving stones
- 7,000 m³ of pipe trenches, of which 1,400 tonnes are hazardous waste