Hegebach, Hilgenbach, Werderstraße in Oer-Erkenschwick
Sewer construction
FBS concrete pipes DN 500/ DN 600 and approx. 80 m FBS concrete pipes DN 1000 were laid over a length of approx. 600 m.
Shaft structures made of precast concrete parts and special shaft structures were relocated.
Flood retention basin and drainage
approx. 3,600 m³ topsoil installation
approx. 23,500 m³ excavated soil RRB base & drain, landfill at AN
approx. 6.800 m² additional topsoil removal in the HRB area
Rockfill from armourstone
Wet seeding
Construction of a new throttle structure (equipment and technical installation)
Fence and gate installations
Earthworks for the relocation of a DN 350 GG water pipe