Green district heating TU Dresden

  • Structural engineering
  • Civil engineering
  • Eiffage Infra-Ost

Kund

Staatsbetrieb SIB Dresden 2

Projektvolym

2.000.000 €

Byggtid

12.2023  –  06.2024

Construction of a heat pump building on the TU Dresden campus, including development work