Kund
DB Netz AG
Projektvolym
1.300.000 €
Byggtid
10.2012 – 11.2012
15.3 km rail renewal with P100 renewal train and ballast cleaning
Rail renewal with the P100 renewal train and ballast cleaning including edge paths, railway ditches and level crossings