Emscherbruch switchgear in Herten

  • Civil engineering
  • Eiffage Infra-West

Kund

Amprion GmbH, Dortmund

Projektvolym

23 months

Reactivation and new use of the "Im Emscherbruch" brownfield site in Herten

The current brownfield site is to be prepared as a location for a switchgear plant. Total area: approx. 115,000 m²

This included the following services:

  • Health and safety measures, work in the black/white area
  • Operation of a soil vapour extraction system
  • Gas measurements during construction
  • Work with protective ventilation
  • Earthworks Soil preparation
  • 52,000 m³ soil improvement
  • 2,500 tonnes of lime-cement mixture
  • 115,000 m² soil profiling and levelling
  • Creation of sealing system
  • 31,000 m³ gas drainage, RCL II
  • 33,000 m³ drainage layer, RCL I
  • 115,000 m³ base course, RCL I
  • 7,000 m³ cohesive material to create a separation trench
  • 15,000 linear metres of DA 125 semi-active degassing system supplied and installed
  • 107,000 m² Combined waterproofing: Protective fleece 1200.00 g/m²
  • Plastic seal 2.5 mm, bentonite seal
  • 200 m steep embankment (height = 4 m)