The current brownfield site is to be prepared as a location for a switchgear plant. Total area: approx. 115,000 m²
This included the following services:
- Health and safety measures, work in the black/white area
- Operation of a soil vapour extraction system
- Gas measurements during construction
- Work with protective ventilation
- Earthworks Soil preparation
- 52,000 m³ soil improvement
- 2,500 tonnes of lime-cement mixture
- 115,000 m² soil profiling and levelling
- Creation of sealing system
- 31,000 m³ gas drainage, RCL II
- 33,000 m³ drainage layer, RCL I
- 115,000 m³ base course, RCL I
- 7,000 m³ cohesive material to create a separation trench
- 15,000 linear metres of DA 125 semi-active degassing system supplied and installed
- 107,000 m² Combined waterproofing: Protective fleece 1200.00 g/m²
- Plastic seal 2.5 mm, bentonite seal
- 200 m steep embankment (height = 4 m)