Nuremberg tramway
Renovation of 475 metres of double track in Äußere Sulzbacher Straße, between Walzwerkstraße and Ostbahnhof
- Demolition and removal of existing tracks with different superstructure systems - the existing tracks were installed as ballastless track with mastic asphalt, in some cases even underpouring was used.
- Installation of tracks of the "Slab track 2016 with grooved rails 59R2 with special grade concrete" superstructure system
- Route optimisation