TGA - School Centre Gerthe Bochum

  • Building construction
  • Technical building equipment (TGA)
  • Eiffage Infra-Hochbau

Kund

Stadt Bochum

Projektvolym

2.300.000 €

Byggtid

11.2023  –  08.2025

Creating a new, friendly atmosphere for pupils in the north of Bochum - the tasks for our TGA team in this new building are quite complex. After all, the new school centre in Bochum Gerthe includes a canteen, a cultural room, a library as well as the Anne Frank secondary school (west wing) and the Heinrich Kleist school (east wing).

Here are our key facts:

  • The building area is approx. 24,000 m²
  • The technical centres are located in the basement, including the heating centre with district heating station, the cold storage tank and heating and cooling distributors
  • We installed a central cooling system on the roof:
    • the cooling capacity of the air-cooled chiller is 472kW
    • The cold storage tank has a capacity of 3,000 litres
  • approx. 360 radiators installed by us ensure a pleasant room climate
  • our team has also installed underfloor heating over 3,480 m² on the ground floor

Creating a new, welcoming environment for pupils in the north of Bochum – the tasks facing our TGA team on this new-build project are certainly complex. After all, the new school complex in Bochum Gerthe comprises a canteen, a cultural hall, a library, as well as the Anne Frank Secondary School (west wing) and the Heinrich Kleist School (east wing).

Here are our key facts:

  • The building covers an area of approx. 24,000 m²
  • The basement houses the technical centres, including the heating plant with district heating station, the cold storage facility, and the heating and cooling distribution systems
  • We installed a central refrigeration system on the roof:
    • the cooling capacity of the air-cooled chiller is 472 kW
    • the cold storage tank has a capacity of 3,000 litres
  • Approximately 360 radiators installed by us ensure a comfortable indoor climate
  • In addition, our team has installed underfloor heating across more than 3,480 m² on the ground floor