The project includes the construction of a new approx. 160 m steel truss bridge over the Lippe as well as the replacement of the existing Lippe bridges with two further identical steel truss bridges, including the associated widening of the flow cross-section in the event of flooding (construction area = flood plain). In addition, the two existing tracks will be renewed over approx. 1.5 km and extended by a third track.
This includes the following services:
- Superstructures = steel construction
- Substructures = solid construction (abutments & centre piers)
- Ground improvement (RSV)
- earthworks
- Superstructure