The bridge has a 3-span superstructure in reinforced concrete construction with spans of
8.25 m/ 15.50 m/ 8.25 m. The clear width between the railings is 2.00 m.
Essential services:
- Supply and install approx. 70 m of dismantled steel railings and curved railings
- Approx. 65 m² removal of the bituminous surfacing on the superstructure
- approx. 80 m demolition of concrete upstand at the cornice area
- Repair approx. 80 m² concrete superstructure panel, prepare concrete base
- Prepare approx. 100 m² surface of the superstructure soffit, produce surface treatment in accordance with OS-C
- Install approx. 5 tonnes of PC mortar incl. bonding bridge on superstructure panel as levelling mortar
- Apply approx. 80 m² surface treatment of flexibilised reactive resin