Signalling boom in Herzogenrath

  • Structural engineering
  • Eiffage Infra-West

Client

DB Netz AG, Köln

Project volume

0.17 million EUR

Construction time

4 months

Delivery and installation of a signalling boom including planning, foundation and steel superstructure

Infrastructure expansion at Herzogenrath station. This included the following services:

  • Planning services, implementation planning including stability analyses
  • Signalling cantilever (box girder, single-shaft, clamped)
    • Clear height 7.8 above SO m, cantilever length 7.0 m
  • Foundation
    • Bored pile ⵁ1.0 m and length 11.0 m
  • Foundation head including anchor bars
    • 1.5 x 1.5 x 1.6 m (L/W/H)