Renewal of the railway viaduct in Klotten, section 3010 at km 44.618. Complete dismantling of the existing railway viaduct including adjacent track supporting slabs as well as the new replacement construction in prefabricated construction method with subsequent lifting of the new construction using a mobile crane and internal prestressing, in each case in a total closure.
New construction reinforced concrete full frame
- Clear width: 4.00 m
- Clear height: >= 2.65 m
- Width between railings: 12.00 m
Essential services:
- 60 m³ in-situ concrete for prefabricated parts in field factory - foundations, frame walls, wings and superstructure
- 20 tonnes of reinforcing steel bars B500B
- 15 m³ in-situ concrete for precast elements in the field factory - track support plates and cantilevers
- 20 m³ in-situ concrete for precast elements in field factory - edge caps
- 90 m² facing brickwork
- 100 m² new road construction