Bridge construction as part of the new B 67n/B 474n Reken - Dülmen project

  • Structural engineering
  • Eiffage Infra-West

Client

Straßen.NRW, RNL Münsterland Coesfeld

Construction time

08/2020 - 03/2021

Construction of bridge structure 18 as part of the new construction of the B 67n/B474n Reken - Dülmen motorway.

Straßen.NRW commissioned Eiffage Infra-West with the construction of BW 18 as an overpass for the new B 67n/B474n Reken - Dülmen over the DB railway line between Dülmen and Coesfeld. The contract includes the bridge structure and a 26 metre-long culvert under the DB line.

The structure is a single-span slab bridge as a half-frame, the superstructure consists of prestressed precast concrete girders and an in-situ concrete addition as a carriageway slab. The span width is approximately 9.50 metres.

With a relatively short core construction time of just 8 months, 400 m³ of soil was replaced, approx. 700 m³ of concrete and approx. 120 tonnes of concrete and prestressing steel were used.