Reinforcement BW Rur

  • Structural engineering
  • Eiffage Infra-West

Client

LB Straßen NRW, Krefeld

Construction time

05/2019 - 11/2019

Installation of two steel structures per girder

A44 motorway near Jülich, reinforcement of BW Rur. With a total length of 141 metres, the superstructure, designed as a 5-span plate girder construction, spans the river Rur and 2 field paths in 4 spans.

The necessary reinforcement was carried out by installing two steel structures per girder in the area of the segment joints between axis B and C on a total of 10 girders, so that 20 girder brackets were produced.

Essential services:

  • Prepare 43 m² concrete base
  • Manufacture 160 bonded anchors
  • Produce 80 drill holes
  • Install 80 pieces of prestressing steel
  • Install 80 pieces of low-vibration grouting concrete (Page V1/10)
  • Install 160 pcs low-vibration grouting concrete (Page V1/50)
  • Install 20 pieces of steel structure (S355 J2)