Krondorf viaduct project

  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Süd

Client

Autobahn GmbH des Bundes

Project volume

46 milion EUR

Construction time

4 years

Reconstruction of the 50-year-old Krondorf viaduct near Velburg on the A3 Nuremberg / Regensburg motorway due to its poor condition and the ever-increasing volume of traffic and the resulting need for load-bearing reserves. Renovation is not possible due to the existing damage and load-bearing capacity deficits.
The existing bridge will be demolished in two construction phases and rebuilt using the incremental launching method.

The new beam bridge will be constructed as a continuous girder over nine spans, with spans of 30 - 60 metres. In total, the structure has an impressive length of 475 metres and spans the valley at a height of around 40 metres.