Replacement construction of eight bridge structures on the A9 near Rohrbach

  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Süd

Client

Die Autobahn GmbH (ehemals Autobahndirektion Südbayern)

Project volume

32.600.000 €

Construction time

24 months

Replacement construction of eight new bridges on the A 9 motorway between the Langenbruck junction and the Holledau interchange

Reconstruction of eight bridge structures on the A 9 motorway between the Langenbruck junction and the Holledau motorway interchange