EÜ over the A43 in Herne

  • Structural engineering
  • Eiffage Infra-West

Client

Deutsche Bahn

Construction time

approx. 27 months (in working group)

Renewal of a railway overpass as part of the six-lane expansion of the A43 in Herne in a joint venture. The bridge consists of two superstructures.

Service SEH Engineering GmbH

  • Bar arch superstructure as a single-span girder with a span of 97.50 m (1,350 tonnes)

Service Eiffage Infra-West GmbH

  • WiB superstructure as a single-span girder with a span of 32.50 m
  • Composite bridge with concreted-in steel girders made of welded solid wall girders