Thyssen bridge in Mülheim

  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-West

Kund

Stadt Mülheim an der Ruhr

Projektvolym

10.4 million EUR

Byggtid

30 months

Expansion of Oberhausener Straße (B223) and new construction of the Thyssen Bridge in Mülheim.

Road, track & structural engineering, construction of the cable conduit system

  • Construction of the bridge structure north of the existing bridge
  • Superstructure in steel composite construction (80 m x 25 m, 3 lanes and 2 tram tracks)
  • New construction of retaining walls
  • Construction of cable routes in the area of the new bridge
  • Renewal of the railway tracks
  • The road construction includes the complete new construction of the B 223, Oberhausener Straße, over a length of 485 m as well as the ancillary facilities.
  • Dismantling of the "old" Thyssen bridge

News:
https://hwb.eiffage-infra.de/news/2019/07/fertigstellung-der-neuen-thyssenbruecke