Bad König, replacement construction of Zell viaduct, B45 UF Mümling via DB
- Functional tendering (planning and execution)
- Construction of the new bridge replacement in the same location
- Length of the viaduct: approx. 120 metres
- Prestressed concrete superstructure with construction on falsework
- Adaptation of the B45 (full extension) to the new structure, including the Helmertweg junction and renewal of the road surface up to the B45 - Jakob-Maul-Straße junction
- Resurfacing of the existing cycle path
- Dismantling of the temporary bridge during construction and construction road