- Microtunnelling DN 1600
- AVN-D (automatic tunnelling machine wet - pressure cushion)
- Use of the hydraulic joint, Jackcontrol system, in curve radius R = 200 m
- Construction site in groundwater protection area directly next to the River Main
- Underpassing the BAB 5 motorway
- Difficult subsoil conditions: Sand, rapidly changing clay
- Encountering wood and other unnatural obstacles
Renewal of wastewater pressure pipe Goldstein, Frankfurt
- Specialised civil engineering
- Eiffage Infra-Spezialtiefbau
