Ophülsgraben in Neukirchen-Vluyn

  • Civil engineering
  • Eiffage Infra-West

Kund

LINEG Kamp-Lintfort

Projektvolym

approx. 2.6 million EUR

Byggtid

February 2016 - April 2017

Clean water regulation of the Ophülsgraben (lot 1) and the Klein Hugengraben (lot 2) in Neukirchen-Vluyn. The upgrading of the Ophülsgraben is a basic prerequisite for securing the receiving water to the Klein Hugengraben.

  • 1400 diameter cast iron pipe as road crossing 30 m Benschenweg
  • 2000 diameter cast iron pipe as road crossing 36 m Niederrheinhalle
  • Pipework on Lindenstraße DN 800 165 m long in shoring 1300 m²
    incl. manholes
  • Loading and removal of 60,000 m³ of soil for a natural trench
    (trench length 1.8 kilometres)