- Single-span, closed reinforced concrete frame in in-situ concrete construction
- Clear flow cross-section b/h = 2.0/2.5m
- Total length of frame base: approx. 37m
- Installation of the frame structure between the existing abutment and wing walls after removal of the old bridge vault
- Road superstructure on the covered structure
Mühlenbach bridge in Nieheim
- Structural engineering
- Eiffage Infra-West