Microtunnelling Hellerup, Copenhagen

  • Specialised civil engineering
  • Eiffage Infra-Spezialtiefbau

Projektvolym

0.2 million EUR

Byggtid

1 month

Inner-city microtunnelling DN 1200

  • Microtunnelling DN 1200
  • Herrenknecht AVN machine (automatic tunnelling machine wet)
  • Flushing conveying
  • Very limited space available at the press pit
  • Location in residential area
  • Clay, silt and sand