Gillbach level crossing in Rommerskirchen

  • Structural engineering
  • Eiffage Infra-West

Kund

DB Netz AG, Duisburg

Byggtid

7 months

Renewal of the railway overpass over the Gillbach in Rommerskirchen, Rhein-Kreis Neuss

The construction was carried out as a frame structure in 6 prefabricated segments, flat-founded on the foundations of the old building and produced in the field factory next to the railway embankment.

Construction of site facilities and field factory,
Production of 6 prefabricated segments in the field factory next to the railway embankment,
Construction of a temporary water diversion,
One-week closure break.

  • Excavation and demolition of the existing vault
  • Driving in the prefabricated parts with SPMTs
  • Installation of the construction backfill
  • Construction of the superstructure in 6 tracks
  • Reopening of the stream