Superstructure/civil engineering:
- 12,701 m track renewal using the assembly line method with ballast cleaning/bed preparation
- Renewal of three culverts and two double-track level crossings
Related services:
- Clean and flush 8,400 m of deep drainage;
- construct 12,700 m of verge paths;
- 165 m of edge path shoring