- Pneumatic tunnelling with open bonnet blade
- Roadheader excavator
- Dry conveying
- Compressed air up to 0.7 bar
- Undercutting 21 tracks at Copenhagen Central Station
- Subsoil Sand, gravel, stones, boulders, erratic blocks
- Advantage of open shield: removal of a large number of boulders up to 1.40 m in length (former bank stabilisation)
- Use as a district heating and media tunnel
Dybbølsbro district heating tunnel, Copenhagen
- Specialised civil engineering
- Eiffage Infra-Spezialtiefbau
