Nuremberg tram, Thumenberger Weg stop

  • Track and railway construction
  • Eiffage Infra-Süd
  • Project update

Kund

VAG Verkehrs-Aktiengesellschaft Nürnberg

Projektvolym

EUR 484,000 net

Byggtid

June - August 2025

Nuremberg tramway

Refurbishment of 100 metres of double track in Äußere Sulzbacher Straße, Thumenberger Weg stop in two construction phases

  • Upgrading of existing tracks with various superstructure systems
  • Installation of tracks of the "Slab track 2016 with grooved rails 59R2 with special grade concrete" superstructure system
  • Route optimisation and adaptation of the track-side kerb to the new track position