Nuremberg tramway
Refurbishment of 100 metres of double track in Äußere Sulzbacher Straße, Thumenberger Weg stop in two construction phases
- Upgrading of existing tracks with various superstructure systems
- Installation of tracks of the "Slab track 2016 with grooved rails 59R2 with special grade concrete" superstructure system
- Route optimisation and adaptation of the track-side kerb to the new track position