Mörlenbach viaduct B 38 Mörlenbach bypass

  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Süd
  • Project update

Projektvolym

EUR 21.6 million net

Byggtid

January 2026 - March 2029

B 38 Mörlenbach bypass, new construction of the Mörlenbach viaduct

  • Located on the new B 38 federal highway as part of the Mörlenbach bypass, connecting the Rhine Valley with the central Odenwald region
  • Construction of the viaduct as a steel composite structure with seven spans using the incremental launching method
  • Construction of the supporting structure of the superstructure as a single-cell, accessible, open box girder with a constant construction height of 2.50 metres
  • Length of the viaduct: approx. 300 metres
  • Construction of BE areas and construction roads
  • Drainage and earthworks
  • incl. embankment foundation and backfill
  • in consortium with HOCHTIEF Infrastructure GmbH