Zell viaduct

  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Süd
  • Project update

Projektvolym

EUR 9 million net

Byggtid

January 2026 - July 2027

Bad König, replacement construction of Zell viaduct, B45 UF Mümling via DB

  • Functional tendering (planning and execution)
  • Construction of the new bridge replacement in the same location
  • Length of the viaduct: approx. 140 metres
  • Superstructure with composite cross-section made of VFT girders with five steel box girders and in-situ concrete additions
  • Repair and resurfacing of the existing cycle path and the construction area on the B45, including resurfacing of the neighbouring junctions
  • Dismantling of the temporary bridge and construction road during construction