Bad König, replacement construction of Zell viaduct, B45 UF Mümling via DB
- Functional tendering (planning and execution)
- Construction of the new bridge replacement in the same location
- Length of the viaduct: approx. 140 metres
- Superstructure with composite cross-section made of VFT girders with five steel box girders and in-situ concrete additions
- Repair and resurfacing of the existing cycle path and the construction area on the B45, including resurfacing of the neighbouring junctions
- Dismantling of the temporary bridge and construction road during construction