ABS Hanau-Nantenbach

  • Track and railway construction
  • Eiffage Infra-Rail

Kund

DB Projektbau GmbH, RB Mitte Frankfurt/ /M.

Projektvolym

9.5 million EUR

Byggtid

04/2016 - 2017

Construction of the "Rheda 2000" ballastless track system

Construction of the "Rheda 2000" ballastless track system in the 5,830 m long double-track section with four single-track tunnels, bridges and several troughs.
Construction of the "Eiffage" trafficable track covering system in the Falkenberg tunnel.

 

Construction work carried out:

  • Construction of around 11,647 m of "Rheda 2000" slab track system in single-track tunnels, in single-track troughs, on structures and on bridges
  • Construction of the transition areas in the slab track
  • Construction of the "Eiffage" carriageway deck system in the single-track Falkenberg tunnel (2 times approx. 2,640 m)