Superstructure reinforcement TB Westerschledde

  • Structural engineering
  • Eiffage Infra-West

Client

LB Straßen NRW, Hamm

Construction time

08/2019 - 04/2020

External prestressing and additional reinforcement was installed on the underside of the superstructure of the prestressed concrete bridge.

Superstructure reinforcement of the Westerschledde viaduct, A44 motorway near Geseke

Steel construction / shear reinforcement
92 steel crossbeam shear prestressing
40 deflection construction
HDW
360 m² Preparing concrete base
184 pcs. recesses produced by HDW
Concrete repair
200 pcs. chiselling out concrete damage, relining
184 pcs. HDW reworking recess, sealing
Reinforced concrete/shotcrete
11.800 pc bond anchors
Install 24 tonnes of reinforcing steel
Produce 33 m³ reinforced concrete
Produce 43 m³ shotcrete
Tendon prestressing
96 bar tendons Transverse post-tensioning Anchor blocks supply, installation
184 bar tendons Shear reinforcement supply, installation
1.497 m Tendons supply, installation