Superstructure reinforcement of the Westerschledde viaduct, A44 motorway near Geseke
Steel construction / shear reinforcement
92 steel crossbeam shear prestressing
40 deflection construction
HDW
360 m² Preparing concrete base
184 pcs. recesses produced by HDW
Concrete repair
200 pcs. chiselling out concrete damage, relining
184 pcs. HDW reworking recess, sealing
Reinforced concrete/shotcrete
11.800 pc bond anchors
Install 24 tonnes of reinforcing steel
Produce 33 m³ reinforced concrete
Produce 43 m³ shotcrete
Tendon prestressing
96 bar tendons Transverse post-tensioning Anchor blocks supply, installation
184 bar tendons Shear reinforcement supply, installation
1.497 m Tendons supply, installation