Repair of the bridge over the Berkel

  • Structural engineering
  • Eiffage Infra-West

Client

Stadt Vreden

Construction time

05/2020 - 07/2020

Repair of the foot and cycle path bridge over the Berkel in the city park in Vreden.

The bridge has a 3-span superstructure in reinforced concrete construction with spans of 
8.25 m/ 15.50 m/ 8.25 m. The clear width between the railings is 2.00 m.

Main services:
approx. 70 m Dismantling of steel railings and supply and installation of curved railings
approx. 65 m² Removal of the bituminous surfacing on the superstructure
approx. 80 m Demolition of concrete upstand at the cornice area
approx. 80 m² Repair concrete superstructure panel, prepare concrete base
approx. 100 m² Prepare surface of superstructure soffit, surface treatment 
in accordance with OS-C
approx. 5 tonnes Installation of PC mortar incl. bonding bridge on superstructure panel as levelling mortar 

approx. 80 m² Apply surface treatment of flexibilised reactive resin