Main services: Cable and utility installation, civil engineering and road construction
- 980 m of 110 kV protective conduit route in concrete blocks to a depth of 3 m, including shoring
- 5,880 m installation of DN160 protective conduit, 3,000 m of DN50 multi-pipe system
- 32 m underpass beneath a listed structure using the pressure drilling method (DN800)
- 1 sleeve structure
- 2,600 m² of asphalt milling and road demolition
- 3,000 m² of asphalt road construction
- 6,200 m³ of trench excavation and ground management