Main services: Inner-city cable laying, utility tunnelling and road construction
- 435 m of 110 kV protective conduit route within a concrete block to a depth of 3 m, including shoring
- 2,600 m of DN160 protective conduit laid, 1,300 m of DN50 multi-pipe system
- Demolition and reconstruction of three natural stone walls
- 1 joint structure, 430 m GP channel,
- 1,800 m² of road excavation and asphalt road construction, 430 m of GP channel
- Demolition and reconstruction of a drinking water pipeline, new construction of road drainage
- 3,000 m³ of pipe trenches and ground management