Inner-city cable laying, media infrastructure works and roadworks in Dresden, Großenhainer Straße

  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Ost
  • Project update

Client

SachsenEnergieBau GmbH

Project volume

1.926.683 €

Construction time

11.2025  –  05.2026

Main services: Inner-city cable laying, utility tunnelling and road construction

  • 435 m of 110 kV protective conduit route within a concrete block to a depth of 3 m, including shoring
  • 2,600 m of DN160 protective conduit laid, 1,300 m of DN50 multi-pipe system
  • Demolition and reconstruction of three natural stone walls
  • 1 joint structure, 430 m GP channel,
  • 1,800 m² of road excavation and asphalt road construction, 430 m of GP channel
  • Demolition and reconstruction of a drinking water pipeline, new construction of road drainage
  • 3,000 m³ of pipe trenches and ground management