Extension of a tunnel in Rastatt as part of the Karlsruhe–Basel line extension and new construction project

  • Track and railway construction
  • Structural engineering
  • Eiffage Infra-Nordwest
  • Eiffage Infra-Rail
  • Eiffage Infra-Süd

Client

DB AG Karlsruhe

Project volume

51.000.000 €

Construction time

01.2022  –  11.2024

ABS / NBS Karlsruhe-Basel, Rastatt Tunnel Extension 2022

ABS / NBS Karlsruhe–Basel, Rastatt Tunnel Expansion 2022

This included the following works:

  • 12,000 m of slab track
  • Two tunnel tubes, each 4.3 km long
  • Two troughs, 800 and 900 metres long respectively
  • Eight cross-passages and one service shaft
  • 1.6 km of lightweight mass-spring system per tunnel tube / frequencies 12.5 Hz and 16 Hz
  • 90,000 m³ of concrete
  • Installation of the floor, side walkways, fire-fighting water mains, pumping stations and rigid road surface
  • Lining of the cross-passages
  • 6,400 m² of noise barrier