Extension of the Rastatt tunnel

  • Track and railway construction
  • Structural engineering
  • Eiffage Infra-Nordwest
  • Eiffage Infra-Rail
  • Eiffage Infra-Süd

Client

DB AG Karlsruhe

Project volume

51.0 million euros

Construction time

01/2022 - 11/2024

ABS / NBS Karlsruhe-Basel, Rastatt Tunnel Extension 2022

This included the following services:

  • 12,000 m of slab track
  • Two tunnel tubes, each 4.3 km long
  • Two troughs, each 800 and 900 m long
  • Eight cross-passages and one supply shaft
  • 1.6 km of lightweight mass-spring system each
  • 90,000 m³ of concrete
  • Installation of the base, edge paths, extinguishing water pipe and slab track
  • Construction of the cross-passages